Construction on the NWSC began in June 2010. The following photos were taken in March 2011, when the center was more than 50% complete.

The computer rooms feature raised floors to ensure an even air flow. Below is a 10-foot high space to accommodate heating, air conditioning, and other mechanical needs. The space also allows supercomputer support infrastructure to be installed with a minimum of disruption in the computer room itself.
Staff Notes